HVAC TESTING AND COMMISSIONING
GearSerie.png

WHEN YOU NEED HVAC SPECIALISTS…

…READ ABOUT OUR SERVICES BELOW

COMMISSIONING

We can deliver key-personnel such as commissioning lead engineers and our own technicians to the project. The advantage for the project regarding quality, HSE and cost-effectiveness in this strategic is terrific.


Instrument and equipment.

HTAC can offer all necessary instrument needed to execute an HVAC commissioning. Calibrated instrument and loggers can be provided, such as manometers, anemometers, balometers, airflow hoods and a various of equipment for measuring static pressure, dynamic pressure, temperature, RPM, vibration, alignment, temperatures, humidity and decibel.

We provide the complete commissioning service including;

  • Environmental Tests

  • Produce CTP (Commissioning Test Procedures)

  • Sound Readings

  • Balancing and Regulation

  • Electrical Testing

  • Rapid Response Shut Down Testing

  • Pressure Regimes Airflow Direction Checks

  • Clean Room Testing

  • Cause&Effect testing

  • F&G testing

  • Interlock setup and testing

  • VAV/CAV damper setup

  • Temperature Mapping

  • BMS/Controls

  • TR Testing

  • LEV Testing

  • Demonstrations and learning

  • Valid Commissioning test reports

SwemaShaded.jpg

 
 

ENGINEERING

HTAC employs a full-time HVAC engineering-team to develop products and systems to ensure that we stay at the leading edge of innovation in our market, whilst remaining fully compliant with the latest certifications and international requirements in the oil&gas industry.

Our engineers procedures include design and manufacturing for new installations and expansion-projects. We have experience to work with the current codes and compliance with the latest standards for the oil&gas industry.

We can offer you HVAC design, commissioning, system and lead-engineers.

Head_eng_shadow.jpg

 
 

TR-TEST

PFEER, Smoke & Gas Ingress, TR, TSR Integrity Testing

In order to comply with SI 1995 No 743, The Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 it is a requirement for the Offshore operator to prove compliance of all Temporary Refuges (TR) in accordance with this regulation.

PFEER defines goals for the preventive and protective measures necessary for managing fire and explosion hazards, and for emergency response. These goals allow duty holders the flexibility to develop detailed arrangements for each stage of an installation’s life cycle.

How can HTAC help you?

Certified specialists within HTAC company have extensive experience in the evaluation and testing of the porosity of TR’s against the infiltration of smoke, fume and noxious gas. We will conduct the required testing to meet the relevant regulations and each test is adapted to suit individual situations;

  • Definitions of TR Boundary

  • Pre-test surveys

  • Testing and Verification

  • Investigation of leakage paths

  • Thermal imaging

  • Smoke testing

  • Repairs to or replacement of modular doors

  • Repair to or upgrades of HVAC systems and components

  • Develop and provide a maintains-plan to minimize future problems

  • Hand over a full valid test-report

TRShaded.jpg

 
 

SURVEY

Our HVAC studies aim to help you identify the condition, functionality and energy-efficiency of technical HVAC systems.

Our ventilation surveys examine factors such as the system’s condition, documentation and maintenance standards, and the cleanliness and risks in terms of indoor air quality.

We also analyse the sufficiency of ventilation, the system’s energy efficiency and the condition of the automation system, as well as the comfort provided by the default values.

Testing, adjusting and balancing (TAB) is necessary to confirm that an HVAC system is performing optimally to meet the requirements on board an offshore installation.

Test and studies can be such as;

  • Airflow verification

  • Fire-damper survey

  • System cleanliness

  • Room pressure measurements

  • PDT (Pressure Differential Transmitter) calibrations

  • Filter status

  • Fan and motor data readings

  • Flow transmitter verification

  • Decibel readings

  • Develop and provide a maintains-plan to minimize future problems

  • Hand over a full valid test-report

AHU_shaded.jpg

OTHER SERVICES

  • Duct leakage test

  • Duct CLEANLINESS test

  • Remote monitoring of fans and motors

  • room pressure set-up

  • pdt calibration